BACHY SOLETANCHE
HENDERSON HOUSE
LANGLEY PLACE
HIGGINS LANE
BURSCOUGH
LANCASHIRE L40 8JS
Tel: 01704 895686
Fax:
Bachy Soletanche are a leading Piling Contractor for the UK construction industry with a wealth of experience and can provide vital technical assistance in all areas of piling and drilling.
Our aim is to meet the needs of our clients by offering intelligent solutions at all stages of a project. Bringing the knowledge of a specialist contractor into the project team at an early stage results in cost certainty and Westpile are keen to be involved as early as possible.
Bachy has long been renowned for its expertise in Rotary and CFA Piling and its innovative approach to the design and construction of retaining walls.
We offer bespoke piling solutions designed in house and constructed by our site teams.
Having access to a large fleet of rigs enables Westpile to offer a broad range of piling techniques and services.
Bored Piling:
Cased Flight Auger Piling
Cased CFA piling was developed to improve on traditional CFA techniques and to be able to offer certain benefits of rotary bored piling without the loss of production that would historically have been the case.
CFA (Continuous Flight Auger) Piling
Continuous Flight Auger (CFA) piling was introduced into the United Kingdom in 1966 by Westpile. Our long experience of this system has shown it to be a speedy and cost effective method of bored piling.
Rotary Piling
Rotary bored techniques offe a larger range of pile diameters and depths than any other piling method; permit pile construction through particularly stiff or hard strata; offer concrete placement to below commencing surface level and can allow inspection of the pile during construction.
Retaining Wall Construction
Retaining Walls
Bachy can design and construct all types of piled retaining walls, using either CFA, Cased CFA or traditional rotary methods.
Contiguous Piled Walls
Contiguous walls can be installed in water bearing soils so long as the water is managed during the temporary and permanent phases of the project.
Secant Bored Piled Walls
Secant piled walls are predominately constructed so that the female piles contain lower strength material than the concrete in the male piles. Walls are installed as hard/firm or hard/soft depending upon the specified requirements for the secant wall and the basement lining wall.
Restricted Access Piling
Bachy has a fleet of rigs that provide the capability to install piles in a number of restricted working conditions.
Please contact us for any further information.



