The Largest Building Products Directory in the UK
LANCASTER HOUSEWELLINGTON CRESCENTFRADLEY PARKLICHFIELDSTAFFORDSHIRE WS13 8RZ Tel: 01543 443060 Fax: 01543 443070
SE Controls Smoke Test in the Passenger Clearance Building, Macao Bridge.
SE Controls - This natural ventilation controls video looks at the benefits of mixed mode and hybrid ventilation and when it's implemented within the natural ventilation control strategy. keywords: Smoke Controls/Natural Ventilation/Window Automation
SE Controls Smoke Ventilation the principles - This video looks at the three main reasons for implementing smoke ventilation into a building. keywords: Smoke Controls/Natural Ventilation/Window Automation
SE Controls - This video looks at when and why to implement a standalone adaptive natural ventilation system. keywords: Smoke Controls/Natural Ventilation/Window Automation
SE Controls The automation of windows can provide many benefits for the building occupants and this video explains why and when window automation should be installed. keywords: Smoke Controls/Natural Ventilation/Window Automation
SE Controls - Our smoke ventilation in residential buildings video looks at the principles of how smoke is ventilated and why, specific to a residential building with some typical smoke ventilation product groups and solutions. keywords: Smoke Controls/Natural Ventilation/Window Automation
Does ISO 9001 cover my FPC audit requirements? Do I need ISO9001 in order to undertake the audit to enable me to make compliant smoke vents?
Can I get a DoP from them?
What regulation changes are coming post Grenfell and the independent review that ensued?
Can I use an Actuator that is tested on any vent that is also tested, and how do I know what profiles I can use for a compliant solution?
A video animation highlighting the importance of smoke control compliance. Designed to educate those within the construction industry, illustrating best practice to ensure the installation of smoke control systems within buildings are compliant to British Standard EN12101-2. Aimed at those responsible for ensuring life safety within buildings across all sectors, the animation covers the importance of compliance to ensure that tenants are protected, the fire service can do their job, and it also highlights the consequences of non-compliance.
What free Area does my AOV Achieve, and how do I calculate the area for the application?
We have been told that if we have been audited to EN14351 then we are fine because we just make the window, they only become AOV's when an actuator is put on them?
A video going through the BIM objects available by SE Controls
Can the non audited commercial fabricator install the smoke vents purchased from a trade fabricator onsite?
SE Controls provide a comprehensive range of Smoke Ventilation Systems, Facade Ventilation Solutions, smoke ventilation systems, environmental ventilation, window automation solutions and Actuators.
A successful client demonstration of a mechanical smoke ventilation system simulating smoke exiting the apartment from where the CFD model was designed.
This video is an overview of the comprehensive range of solutions provided by SE Controls for smoke ventilation, environmental ventilation and window automation.