Case Study - Gaberston House, Alloa

January 2026

Client: Fleming Builders
Project Location: 82 Whins Road, Alloa, Clackmannanshire
Project Status: Ongoing (completion date not confirmed)

Project Overview

Gaberston House is a sheltered accommodation development comprising 16 flats, designed to provide comfortable and accessible living for residents in Alloa. The scheme aims to combine functionality with attractive architectural detailing.
Our Contribution

Robeslee manufactured and supplied a range of bespoke precast concrete elements tailored to the project’s requirements, including:

Single weathered wall copes

Half-round wall copes

Slip cills

Stooled cills

All products were manufactured in-house to ensure consistent quality, precise fit, and smooth integration with the building’s design.
Challenges & Solutions
Custom profiles and finishes

We produced multiple coping profiles to suit different wall details, ensuring both durability and visual cohesion.
Limited on-site information

Close coordination with the contractor ensured correct dimensions and timely delivery despite a lack of publicly available construction updates.
Outcome

Upon completion, Gaberston House will offer high-quality sheltered accommodation, with robust and well-crafted precast features enhancing both its aesthetic appeal and structural durability.

Resources for ROBESLEE CONCRETE CO LTD