Charter Global - A Challenging Install

March 2019

A Challenging Install

The £12m exhibition space now features no less than five galleries, an auditorium for up to 200 people, a learning studio and independent cafe. All of which made for a tricky installation.

There are a number of manufacturers offering quality security shutters to LPS 1175 Issue 7 SR4.

However the exhibition loading area required a abnormally large shutter, but lacked the headroom to support a standard motor.

Devising a unique system with a bespoke motor specification, an Obexion MD SR4 Shutter was installed.

Ultimax controls were incorporated along with other complex features, such as status indication. This was mainly led by the requirement from the facilities team.