103 parking spaces created for prime location in Canary Wharf
November 2020

Another recent installation by DPS of the Klaus Trendvario 4100 Semi-Automatic System for Galliard Construction, providing 103 parking spaces to this prime location in Canary Wharf. The system is accessed at ground level. It can accommodate two vehicles one above the other, one of which is lowered into the pit. It requires less room height as a result. The parking spaces are moved vertically and horizontally, and the automatic control system transports the selected parking space to the desired position. For maximum operating safety, the access level is secured from the entire system by gates. This also protects the vehicles from theft and vandalism.